Saturday, January 31, 2009

Few Project Photos

Stalk - on Method of 42" Skid
Stalk-on of 42" Skid

Welding of 42" Spool with External Clamp


Lowering of 42" Skid



Connecting Davit to pre rigged rigging on Spool to lift by ROV




Installtion of Buyoncy Tank by Depressor Frame





Installation of Buyoncy Tank on 42" Pipeline on Barge Deck
Lifting of 42" Closing Spool

Lifting of 42" Valve Skid from Material Barge

42" Lifting Clamp

Depressor Frame

42" External Clamp

Pilling

Cutting Seafastening of TOP side
Jacket Installation

Topside
Jacket

Installation of Jacket

Lifting of Jacket

Lifting of Jacket


Lifting of Topside

Sub sea Plem

3 comments:

  1. Interesting blog. Really inspire me as we have the same back ground, working for offshore industry.
    How is the feeling when you move from employee to self-employee?
    How's the new office goes? Hopefully got a project already.
    Can't wait to read the next improvement of this office.

    ReplyDelete
  2. Hi Benny,

    Thanks for yr comments. As i work as freelencer so at present due to economy down time its not much to do now adays, therfore i have pick up some work in Gulf of Thailand. Installtion few pipelines and Platfrom.

    Let me know if u have some thing.

    ReplyDelete
  3. At this point you'll find out what is important, it all gives a url to the appealing page: General Contractors in Canada

    ReplyDelete